Subject : Monitoring of works and technical assistance at Nador West Med port
Challenges :
Consistance :
Technical assistance and monitoring of the construction works for:
A main dike with a length of 4,233 m, of which 1,500 m is a sloped dike and 2,733 m is a caisson dike
A secondary sloped dike with a length of 1,200 m.3 km of container quays at -18 m.3 fuel berths at -22 m ZH with a maximum capacity of 175,000 tons.22 million m³ of dredging
Review and validation of the execution studies prepared by the contractor
Services :
Design, Port development, Technical assistance, Project Management