INTEGRATED PLATFORM OF ABIDJAN PORT

  • Client : TMSA
  • Year : 2017
  • Location : Ivory Coast
  • Subject : Study for the Development of an Integrated Platform: Industrial, Logistical, and Decongestion at the Port of Abidjan, Site PK 24

Challenges :

Missions :

  • Conduct a site analysis for the project.
  • Perform a preliminary analysis of the main project components:
    • Logistics Zone (3PL)
    • Free Trade Zone
    • General Industrial Zone
    • Area for Local SMEs/TPEs
  • Develop a preliminary master plan.
  • Estimate preliminary investment costs.

Services :

Consulting, Economic Study, Master Planning