CONSTRUCTION OF THE NEW PORT TANGER MED 2

  • Client : TMSA
  • Period : -
  • Location : Morocco
  • Subject : Construction of the new Tanger MED 2 port

Challenges :

The intensification of freight exchanges required an expansion of the Tanger Med port complex. In this context, TMSA made the right decision to launch the extension of the Tanger Med complex through the development of the Tanger Med II port, which thus becomes the largest port capacity in the Mediterranean and Africa.

Missions :

Technical studies and monitoring of the works for the realization of:

  • 4.8 km of caisson dikes in depths of up to -35 m ZH
  • 2800 linear meters of quays in blocks at -18 m ZH
  • 160 hectares of land reclamation
  • 2.5 million m³ of rock removal
  • Service quay;Roads and various networks
  • Access and control areas
  • Review and validation of the execution studies prepared by the contractor

Services :

Design, Port infrastructure development, Technical assistance, Project Management