NEW SHIPYARD AT THE PORT OF CASABLANCA

  • Client  : ANP
  • Period : 2017-2019
  • Location : Morocco
  • Subject : Technical assistance and monitoring of the construction of the new shipyard at the port of Casablanca

Challenges :

Consistance :

Establishment of the master plan for the new shipyard at the port of Casablanca, including:

  • Dredging, excavation & rock removal:
    • Berth No. 1, approximately 350 m long at -8.70 m ZH
    • Connecting quays, approximately 110 m long at -8.70 m ZH
    • Strap crane 60 m long and 13 m wide
    • A dry dock measuring 240 m long and 40 m wide
    • Backfilling of platforms with a total area of approximately 21 hectares
    • A synchrolift with a capacity of 5,000 tons and a ship lift with a capacity of 300 tons
  • Conducting agitation and maneuverability studies..

Services :

Consulting and expertise